1510015272766

AIRPLANE,AIR-REFUELING

Part No.: KC135ESTRATOTANKER,

NSN Summary
NSN Description Assign Criticality Status Codification Country
1510015272766 AIRPLANE,AIR-REFUELING 01/27/2005 X Active

Open Solicitations

Issued Closing Solicitation Clin Cage ECV Status

Request A Demo

Request a Demo to see all details.

Request Demo

Manufacturers

Part Number Company Cage P/N added P/N deleted RNVC RNCC RNAAC RNFC SADC DAC Item Status
KC135ESTRATOTANKER ######### ######### ######### ######### ######### ######### ######### ######### ######### ######### #########

Request A Demo

Request a Demo to see all details.

Procurement History

Company Cage Award Date Qty Unit Price Total Price Contract Delivery

Request A Demo

Request a Demo to see all details.

Request Demo

Management Data

MOE SOS AAC Unit Pack UOM Unit Price SLC Date ELA FCS MCC
Air Force FHZ A 1 EA 0.01 0 10/01/2005

A PHP Error was encountered

Severity: Notice

Message: Undefined index: frase_code_statement

Filename: open_search/nsn_details.php

Line Number: 248

Backtrace:

File: /var/www/www.fbobiz.com/public_html/catalog/application/views/open_search/nsn_details.php
Line: 248
Function: _error_handler

File: /var/www/www.fbobiz.com/public_html/catalog/application/controllers/Opensearch.php
Line: 558
Function: view

File: /var/www/www.fbobiz.com/public_html/catalog/index.php
Line: 317
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Undefined index: frase_code_statement

Filename: open_search/nsn_details.php

Line Number: 256

Backtrace:

File: /var/www/www.fbobiz.com/public_html/catalog/application/views/open_search/nsn_details.php
Line: 256
Function: _error_handler

File: /var/www/www.fbobiz.com/public_html/catalog/application/controllers/Opensearch.php
Line: 558
Function: view

File: /var/www/www.fbobiz.com/public_html/catalog/index.php
Line: 317
Function: require_once

Technical Info

Name Value
OVERALL WIDTH 130.100 INCHES NOMINAL
OVERALL HEIGHT 41.800 INCHES NOMINAL
SPECIAL FEATURES PRIMARY FUNCTION AERIAL REFUELIN G AND AIRLIFT;PRIMARY CONTRACTOR BOEING COMPANY;POWER PLANT 4 PRATT AND WHITNEY TF-33-PW-102 TURBOFAN ENGINES;THR UST 18,000 EACH ENGINE;SPEED 530 MILESPER HOUR AT 30,000 FEET;CEILING 50,000FEET;CREW 4;MAXIMUM TAKEOFF WEIGHT 322,500 POUNDS
OVERALL LENGTH 136.300 INCHES NOMINAL
END ITEM IDENTIFICATION KC135

An aircraft modified to perform air-to-air refuel operations for one or more aircraft. It may be equipped with a boom or other means of transferring fuel to other aircraft.


FIIG Inc Info

FIIG INC Description Detail
66708 66708 AIRPLANE,AIR-REFUELING

MOE Data

Country MOE AMC AMSC NIMSC Eff Date IMC IMCA DSOR Collaborator Receiver AAC FMOE
FXX4 0 0 F 01/01/2005 FT

Freight Data

Integrity Originating HMC WCC TCC SHC ADC ACC ASH LTL NMFC NMFC Sub Item UFC Freight Description Rail Variance
TK 772 Z 9 A B Z D 011760 X 04705 AIRCRAFT/AIRCRAFT PART VIZ:

Packaging Data

Source PICA / SICA Packaging Category Storage Preservation Clean/Dry INT Qty Unit Weight Unit Size Unit Pack Cube Item Weight Item Dims
Preservation Material Wrapping Material Cushioning / Dunnage Cushioning Thickness Unit Container Intermediate Container UCL Special Marking Level A Packing Level B Packing Minimal Packing Optional Procedure

Item Standardization

Status Code Originator Date Status
Authorize in specific FSC TU 01/27/2005 Active